CURRENT DESIGN, EXPLANATION AND SOLUTION
One of the requirements for the design of this office is that all the areas that have a public character visually belong to the same space, making a distribution with low elements or glass walls to enhance the feeling of spaciousness. The first impression is important, therefore, upon entering the office, practically the entire space is visible. This gives a feeling of spaciousness. They have worked with light colors. At the entrance, a marés wall (sandstone typical of the area) original to the building has been recovered. The meeting room is situated in a glass box. As its use is not continuous throughout the day, the priority is to provide the space with general amplitude. The walls and sliding glass doors allow the necessary privacy when the room is used. The two concrete pillars are integrated into a closet that delimits the meeting room. At the entrance, a closet front solves the storage needs of an office while hiding, behind one of the doors, access to the toilet.
REDUCED PALETTE CLEAR COLORS, AMPLITUDE AND TRANQUILITY
The palette of textures and colors has been reduced to the maximum, where the sliding oak doors that go from floor to ceiling and the old marés wall of the building stand out against the white. Of the lighting, the recessed spotlights in the form of a grid stand out as the main lighting and the LED light baths located within the recesses of the perimeter walls as secondary lighting. Clean, neutral and functional space, minimalist style. The result is a space where we can carry out our work with the greatest efficiency, a pleasant environment where our clients feel at home.
The intervention carried out increases the value per square meter of the investment in the property, exceeding the cost of the reform.
The project is the confirmation that it is possible to control and reduce deadlines to the maximum if we meet the following requirements: Clear idea of the objective pursued by the intervention Exhaustive prior analysis. Project that maximizes the possibilities of the property minimizing reducing the intervention to a minimum. Flexibility in the choice of materials that allow rapid supply. Correct planning in detail of all the phases, being demanding but realistic with the deadlines Construction management with a strict control of the execution Quick adaptation to the inevitable problems that the execution of any reform raises. Coordination of the different industries.